Skip to main content

1st Sky OMA

Loading weather...

Bellevue police ride-along leads to officers arresting driver with 5 pounds of marijuana

A friendly ride-along with Bellevue police turned into a drug bust.

Read the full article on KETV 7

image

What started as an invitation to accompany an officer during a traffic patrol quickly turned into anything but. As part of the Sarpy County Traffic Task Force, Bellevue police have one officer on the bridge monitoring speeds.Other officers line the on-ramp waiting for calls.”Number one lane, the red Chevy pickup, 81 at 1676.0,” dispatch said.After that call, Officer Crystal Kenny is off.”The goal is to stop cars off the highway because it’s unsafe to stop on the highway, but sometimes violators don’t get the picture to pull off the roadway,” Kenny said.She begins the traffic stop, and the driver pulls over as KETV’s Izzy Fonfara Drewel watches from the officer’s patrol unit. Another officer joins her, and police ask the man to exit his truck. Kenny said the driver admitted to having five pounds of marijuana. He’s put in handcuffs and gets into the cruiser. The officers then pull boxes and bags out of the truck, looking for the alleged drugs before taking him back to the Bellevue police station. After dropping off evidence and finishing paperwork, Kenny goes back to Highway 75 to continue with the extra enforcement. The driver’s name and possible charges are not being released at this time.Make sure you can always see the latest news, weather, sports and more from KETV NewsWatch 7 on Google search.NAVIGATE: Home | Weather | Local News | National | Sports | Newscasts on demand |

What started as an invitation to accompany an officer during a traffic patrol quickly turned into anything but.

As part of the Sarpy County Traffic Task Force, Bellevue police have one officer on the bridge monitoring speeds.

Advertisement

Other officers line the on-ramp waiting for calls.

“Number one lane, the red Chevy pickup, 81 at 1676.0,” dispatch said.

After that call, Officer Crystal Kenny is off.

“The goal is to stop cars off the highway because it’s unsafe to stop on the highway, but sometimes violators don’t get the picture to pull off the roadway,” Kenny said.

She begins the traffic stop, and the driver pulls over as KETV’s Izzy Fonfara Drewel watches from the officer’s patrol unit.

Another officer joins her, and police ask the man to exit his truck.

Kenny said the driver admitted to having five pounds of marijuana. He’s put in handcuffs and gets into the cruiser.

The officers then pull boxes and bags out of the truck, looking for the alleged drugs before taking him back to the Bellevue police station.

After dropping off evidence and finishing paperwork, Kenny goes back to Highway 75 to continue with the extra enforcement.

The driver’s name and possible charges are not being released at this time.

Make sure you can always see the latest news, weather, sports and more from KETV NewsWatch 7 on Google search.

NAVIGATE: Home | Weather | Local News | National | Sports | Newscasts on demand |

loader-image
Omaha, US
7:23 pm, Oct 8, 2026
temperature icon 69°F
Partly Cloudy
59 %
1014 mb
9 mph
Wind Gust 17 mph
Clouds 34%
Visibility 6 mi
Sunrise 7:27 am
Sunset 6:54 pm

MORE newsNEWS